Features/03 · The bill
Jobs do not arrive in one shape. Sometimes the client sends a bill of quantities as a spreadsheet and wants it back priced. Sometimes there is nothing but a drawing set. Sometimes you know the job well enough to type it. All three, and your own templates, land in the same editor.
Mix them freely in one estimate — an imported section, a measured section and a typed section sit side by side and total together.
The bill editor
A new estimate opens as Revision 1. Sections run down the left, the bill grid takes the centre, the Data Sheet sits under it showing how the selected item is built up, your template library and resources are on the right, and the totals run along the bottom and move as you work.
| Item | Description | Qty | Unit | Rate | Total | Came from |
|---|---|---|---|---|---|---|
| 2.01 | Warm roof, TPO mechanically fixed | 1,240 | SF | 9.999 | 12,398.76 | Takeoff VEC |
| 2.02 | Perimeter edge trim, powder coated | 318 | LF | 24.10 | 7,663.80 | Template |
| 2.03 | Rainwater outlets, complete | 6 | EA | 186.40 | 1,118.40 | Typed |
| 2.04 | Parapet capping — north elevation | — | LF | — | — | GAP imported |
Route 01
Drop their workbook on the project vault. The import shows you the whole spreadsheet — every tab, as it looks — rather than asking you to describe it first and hope. Point at the description, unit and quantity columns, correct the guess if it is wrong, tick the rows you want, and import.
Route 02
Name a section, add an item, and fill in the cells the way you would a spreadsheet — double-click, type, Enter. Then select the item, open its build-up, and add the resources it takes.
Give each a code and a title, add as many as the bill needs, and rename one by double-clicking its band in the grid. Items drag between sections and re-price under where they land.
Add resource picks from the database this job is pinned to. Set each line's quantity per bill unit; the factors and waste columns are the same ones your templates use.
Something not in the book — a one-off hire, a specialist's day rate — goes in as a free-text line with its own rate, without polluting your library with a row you will never use again.
An item can carry more than one, each on its own tab: a base build-up and an alternative, or the supply and the fix. They total into the one item.
A build-up you typed for this job and would use again becomes a template with Create template from build-up. Your library grows out of real jobs.
Items are numbered for you and stay unique. Re-sequence a section when you have finished rearranging it, rather than fighting the numbers while you work.
Routes 03 & 04
Measurements you have traced and confirmed on the drawing go across as bill lines: pick the estimate, pick the section, push. The quantity arrives with its working and its VEC tag intact, so the bill knows the number came off a sheet at a stated scale and can prove it. Push more later and it adds to the same estimate rather than replacing it — a takeoff done in stages is normal, not a special case. How the measuring works.
Questions
Yes, and it is one of the routes the software is built around. The import shows you the whole workbook as it looks — every tab, including the cover sheets and the trades you are not bidding — you point at the description, unit and quantity columns, tick the rows that are yours, and import. Then you price them.
It arrives as a named GAP line carrying the reason it has no number, rather than as a zero or a guess. You fill it by measuring it on the drawings or by typing the figure yourself, and either way it is recorded as yours. An import never invents a quantity.
Yes. An imported section, a measured section and a section you typed sit side by side in the same bill and total together. Each line keeps a record of where it came from, so mixing them costs you nothing in traceability.
Because the rate is whatever the item's build-up costs: the resources it consumes, at your rates, with your factors and your waste. Type a rate and nobody can check it later. Build it up and the internal cost report can show exactly how the number was arrived at.
Duplicate the revision. The copy carries the same pinned rates, so a leaner build-up or an alternative system can be compared against the original like for like. The revision you sent stays exactly as you sent it.
No. Local edits stay local — a change inside an estimate never reaches back into the template it came from. When a build-up is good enough to keep, you promote it to the library deliberately with Create template from build-up.